Preparation before installation
Before installing the dust collector for coal-fired boilers, sufficient preparation work is required. Firstly, it is necessary to understand the structure, working principle, and performance parameters of the dust collector in order to install and use it correctly. Secondly, it is necessary to ensure the safety of the installation site, including cleaning the site, checking the power and gas sources, etc. Finally, prepare the necessary tools and materials for installation, such as cranes, screwdrivers, sealants, etc.
Basic production
The basic production of coal-fired boiler dust collectors is an important part of the installation process. Determine the position and size of the foundation based on the design drawings and on-site conditions, and carry out construction. The foundation should be sufficiently stable to support the weight of the dust collector and the vibration during operation. During the production process, attention should be paid to the flatness and firmness of the ground to ensure the stable operation of the dust collector.
equipment installation
Before installing the dust collector body on the foundation, it is necessary to check the construction quality of the foundation and the transportation quality of the equipment. Ensure that the basic surface is flat and sturdy, the equipment model and specifications meet the design requirements, and there is no obvious damage or deformation on the equipment surface. Based on the design drawings and on-site conditions, determine the installation position and direction of the equipment, and use appropriate tools and materials for installation. During the installation process, attention should be paid to the stability and sealing of the equipment to avoid looseness or leakage.
Pipeline connection
The pipeline connection of coal-fired boiler dust collector is one of the important links in the installation process. According to the design drawings and on-site conditions, determine the position and direction of the pipeline, and carry out construction. When connecting pipelines, appropriate fittings and sealing materials should be used to ensure the sealing and stability of the pipeline. At the same time, it is necessary to consider the thermal expansion and contraction phenomena of the pipeline to avoid pipeline rupture or leakage.
Electrical installation
The electrical installation of coal-fired boiler dust collectors is one of the important links in the installation process. Based on the design drawings and on-site conditions, determine the location and direction of electrical circuits, and carry out construction. Proper cables and wires should be used to ensure electrical safety and reliability. At the same time, explosion-proof and lightning protection measures should be taken into consideration to ensure the safety of equipment and personnel.